S. C. & D. Railroad org
also known as: Silver City branch of the Santa Fe
Summary:Β Β Railroad completed May 12, 1883, later became the Silver City branch of the Santa Fe.
Completeness: 44/100 Grade D
- Editor summary
- Sourced claims (β₯3)β Has 1/3 sourced claims. Extract more from existing chunks or ingest a new source.
- Multiple primary sourcesβ Has 1 source(s). A second independent source dramatically raises credibility.
- Coordinates
- Operating / life datesβ A bounding date (year is enough) sharpens the timeline and the map slider.
- Wikidata authorityβ Link a Wikidata QID to unlock automatic enrichment from authority records.
- Published storyβ Generate a permanent story page via the admin Story API β drives SEO + reader retention.
- Alternate names
Next steps to raise the score:
- Sourced claims (β₯3): Has 1/3 sourced claims. Extract more from existing chunks or ingest a new source.
- Multiple primary sources: Has 1 source(s). A second independent source dramatically raises credibility.
- Published story: Generate a permanent story page via the admin Story API β drives SEO + reader retention.
π Tell Me the Story:
Claims (1)
arrived_in
completedβ 1883-05-12
cited from In spite of his very active life and large⦠(1891)by the way is the
most substantial and best built city in the terri-
tory. He is general manager of the Hastings
Lumber Co., incorporated under the laws of
New Mexico and brought in the first planing
and wood working machinery ever put inβ¦
Sources (1)
In spite of his very active life and largeβ¦ β
1891 Β· newspaper Β· public-domain Β· details